special-projects-dcs-logistics

Pilot & Escort Vehicles

Nationwide Service

The Most Helpful Teams In The Business

Abnormal Load Special Projects

Call In The DCS Abnormal load Escort Special Projects Team

Special Projects provide a specialist service to the Heavy Haulage industry providing them with Special Project Teams who are all CSCS qualified and have all been placed through a safety critical medical examination. Each team has a team leader that you can trust to keep the job on task and on time assuring the deadlines are met as quickly and as efficiently as possible.

The team is made up of experienced people with a solid background in Heavy Haulage and Specialist Projects. Our DCS Special Projects team have a wealth of experience covering all aspects of the sector from transportation planning through to slinger banksman. Each team has a fully equipped support vehicle and are also capable of dealing with any oil substance leeks that could happen on a project along with first aid kits, traffic cones, fire extinguisher’s & two way radios.

We know that many Abnormal Loads are unusual one off special projects and here at DCS Special Projects we are all about finding the best, fastest, safest and most economical solution for your special project. One of recent special projects was a Railway signal switch room that was installed in the rural Worcestershire countryside, DCS Abnormal load Escort Special Projects escorted the load to the site and then helped with the placement of the switch room on to a concrete pad this project was performed overnight for minimum disruption to both road and rail users, the switch room was then hydraulically jacked into position.

dcs-special-projects-001
dcs-special-projects-002

Our DCS Abnormal load Escort Special Projects team have been deeply involved in a high voltage cable reeling project that has spanned the country and is now on the last leg in Scotland. The cable reels are first met by our crews and haulier in Liverpool where they are then escorted and positioned into place and laid over an 8-10 hour period. This is a task that requires a high level of skill, concentration and patience. The team are then involved in returning the empty reels to Liverpool and are there to assist in loading the next high voltage reel for the next reeling site.

We Are Currently Available To Help Move Your Abnormal Load

Translate »